Skip to main content

ECBVerdyol

  • English
  • Spanish

Main navigation

  • Home
  • Products
    • Erosion Control Blankets
    • Turf Reinforcement Mats
    • Sediment Control
    • Biotic Soil Amendments
  • Case Studies
  • Resources
  • Team
  • Installation
  • FAQ
  • Blog
  • Contact
  • Job Opportunities

Case Studies

Breadcrumb

  1. Home
  2. Case Studies
Filter
  • Sitio altamente erosionable
  • Alaska
  • Arid Climate
  • Biotic Earth
  • Biotic Earth
  • Canada
  • Clay Soils
  • Clima árido
  • Endmiendas Bioticas
  • Enmienda Biotica
  • Environmentally Protected Site
  • Erosion Control Blankets
  • Especies invasivas
  • Estados Unidos
  • High heat conditions
  • High Visibility Site
  • Highly Erodible Site
  • Invasive Species
  • Latin America
  • Limited Access
  • Little Organic Matter
  • Livestock
  • Low Budget
  • Malas Hierbas
  • Manitoba
  • Manta hidraulica
  • minería
  • Mining
  • Minnesota
  • Native Seeds
  • No supplemental watering
  • Northern Climate
  • Ontario
  • pendientes pronunciadas
  • Poca materia orgánica
  • Previous Vegetation Failed
  • Previously failed revegetation
  • Quebec
  • Quick Vegetation Required
  • Reclamation
  • recuperación
  • Remote Site
  • Residential
  • restauración
  • Restoration
  • Sandy Soil
  • semillas nativas
  • Shaded slopes
  • Significant Rain Event
  • Sitio protegido
  • sitio remoto
  • Slopes of 3:1 or greater
  • Steep Slopes
  • suelo arenoso
  • Suelos Pobres
  • Texas
  • Tierras aridas
  • TRMs
  • UK
  • USA
  • vegetación rápida requerida
  • Vegetation required for project close out
  • Washington
  • Waterway
  • Wattles/Stenlogs
  • Wildlife Issue

Pennsylvania State: Route 219

Since a plan had not been in place for preserving the topsoil , the soil on the site was lacking the nutrients needed for successful plant growth and sustainability. Willows were dotted around th site, but struggled due to the poor quality soil. PennDOT had seeded the area three times with inadequate results. The Engineering Architecture Design Services (EADS) Group asked Triton Environmental of Pittsburgh, PA for assistance.

View More
Finished Project, Green Grass

River Avenue Condominium Shoreline Restoration Winnipeg, MB

An area along the shoreline of the Assiniboine River was eroding due to water level changes and wave action from boats. The engineer (KGS Group) designed a riprap toe to reinforce the lower shoreline and had originally specified four inches of imported topsoil and sod for the upper section. After the initial design, hydraulic options were considered as alternatives due to limited access.

View More
Finished Project, Green Grass

Goldendale, WA

State Department of Transportation Maintenance workers in Goldendale, Washington were faced with a common challenge when restoring vegetation at the interchange between highways 14 and 97: low organic content in the soil and a lack of precipitation. Located in the rain shadow of the Cascade Mountains, the project area receives yearly average rainfall of only 8 to 12 inches. This produces a landscape of open bunch-grass
prairies dotted with sagebrush and rabbit brush containing the occasional juniper tree. During the summer months very little precipitation will ever reach the ground resulting in near desert like conditions. Even though the site was situated along the mighty Columbia River, water was in short supply. Any restoration efforts would be complicated by historic low levels of precipitation and compounded by the existing drought facing the region at the time of installation.

View More
Finished Project, Green Grass

Cordova, Alaska

Bohemian Knotweed is an invasive species that can take over an area, choking out existing vegetation and leading to erosion as the better suited species are displaced. Such was the case in Cordova Alaska, situated on the southeastern end of Prince William Sound. Eradicating the knotweed and establishing desired vegetation quickly was necessary to halt the advance of the destructive knotweed and restore the area.

View More
Finished Project, Green Grass

Baffin Windfarm Kenedy Co. TX

Previous attempts at erosion control and vegetation establishment had failed on tower footings at the Baffin Windfarm south of the city of Sarita in Kenedy County Texas. Hot, dry conditions, low soil fertility, and
additional issue of the wind farm being an active cattle ranch combined to make clear why previous attempts at revegetation had been unsuccessful. Due to entanglement risk, the property owner also dictated no erosion control blankets with netting could be used – all erosion control must be hydraulically applied. A special blend of of seed was required due to grazing activity.
 

View More
Finished Project, Green Field

Sunset Farms Landfill - Manor, TX

Previous attempts to revegetate using a fully synthetic TRM (Turf Reinforcement Mat) on other areas of the Sunset Farms Landfill in Manor, TX (just outside of Austin) had not reached satisfactory density vegetation for Republic Services.

View More

Line 2E Terra Nova Case Study: Terra Nova, ON

With extreme cut inclines (1:1 and steeper), the Line 2E Road project, near Terra Nova, in Southern Ontario, was quite challenging.

View More
ECB Verdyol

Olympic Park

The Canada Olympic Park featured steep slopes that were highly erodible due to the extremely sandy slopes. This caused runoff and sediment accumulation on the COP West Parking Lot. 

View More
ECBVerdyol

Dillingham Airport

The extension of a runway at the Dillingham Airport was needed to allow access to larger planes and to improve safety at the site.

View More
ECB Verdyol

Milner Ridge

This project for a provincial medium-security jail called for two waste water treatment ponds, with 70,000 m2 (83,719 sy) of slopes and channels to install and protect. The project location had incredibly sandy and erodible soils due to the area being a sand deposit from Lake Agassiz that was created during the last ice age. 

View More
ECB Verdyol

South Wales, United Kingdom

The local community of Glyncoch located in Pontypridd South Wales had a challenge on their hands. With a limited budget approved by the local council and operating with volunteer labor trying to regenerate the local community the goals of building a center that would really help the surrounding neighborhood seemed out of reach.

View More
ECB Verdyol

Mexico City

Successful  vegetation was crucial to stabilize an 8,000 square meters steep embankment on the Mexico –Puebla Highway.

View More
ECBVerdyol

Coal Basin Reclamation 

The Coal Basin project area is located in the White River National Forest, northwest of Redstone, Colorado.

View More
ECBVerdyol Logo

Nevis, Minnesota Project

A residential house had been built and there was a significant hillside that had been removed to provide space for a driveway. After the excavation of the site, the homeowner had a slope that was composed of very fine sands that needed to be stabilized. The slope was so unstable and steep that traditional methods of placing topsoil were difficult to utilize.

View More
ECBVerdyol

Reserves at Chesterfield Village

The Reserves at Chesterfield Village is an upscale residential development bordering Chesterfield Creek.

View More
ECB Verdyol

Business 83

A side slope from a roadway ended at the fence line of a private property on this project; so long-term vegetation to prevent possible erosion was a necessity.

View More
ECBVerdyol

San Antonio River Authority

The San Antonio River Authority needed to vegetate a section of the Mission Reach Project on the San Antonio River. The project site had previously needed to have invasive species removed and was in an area that was prone to erosion due to concentrated flow: quick and dense desirable vegetation establishment was imperative to combatting both issues

View More
ECB Verdyol

Papillion Road Project

View More

Contact

Riverton Plant
Highway 8 & RD 136N Riverton,
Manitoba R0C 2R0 Canada
Email: csr@ecb.ca
We have stocking locations in both the US and Canada

Office

Toll-Free:
1-866-280-7327

Sitemap

  • Home
  • Products
  • Case Studies
  • Resources
  • Team
  • Installation
  • FAQ
  • Blog
  • Contact
  • Job Opportunities

Products

  • Erosion Control Blankets
  • Turf Reinforcement Mats
  • Sediment Control
  • Biotic Soil Amendments

Connect

  • Facebook
  • Twitter
  • YouTube

Purchase Information

Please call: 1-866-280-7327
Orders & Sales Inquiries
Phone: 1-866-280-7327
Email: sales@ecb.ca

Winnipeg Web Design By Verda Design
© 2022 ECBVerdyol. All Rights Reserved.

ECB Newsletter