Overview

The extension of a runway at the Dillingham Airport was needed to allow access to larger planes and to improve safety at the site. This improvement would allow greater transportation of the world’s largest Sockeye salmon runs to be shipped around the globe. Due to the remote location of the site, importing topsoil was deemed too expensive, so vegetation was required on the base material used to build the runway extension.