An area along the shoreline of the Assiniboine River was eroding due to water level changes and wave action from boats. The engineer (KGS Group) designed a riprap toe to reinforce the lower shoreline and had originally specified four inches of imported topsoil and sod for the upper section. After the initial design, hydraulic options were considered as alternatives due to limited access.