Skip to main content

ECBVerdyol

  • English
  • Spanish

Main navigation

  • Home
  • About Us
  • Products
    • Erosion Control Blankets
    • Turf Reinforcement Mats
    • Sediment Control
    • Biotic Soil Amendments
  • Shop
  • Case Studies
  • Resources
  • Team
  • Installation
  • FAQ
  • Blog
  • Contact
  • Job Opportunities

Case Studies

Breadcrumb

  1. Home
  2. Case Studies
Filter
  • Sitio altamente erosionable
  • Alaska
  • Arid Climate
  • Biotic Earth
  • Biotic Earth
  • Canada
  • Clay Soils
  • Clima árido
  • Endmiendas Bioticas
  • Enmienda Biotica
  • Environmentally Protected Site
  • Erosion Control Blankets
  • Especies invasivas
  • Estados Unidos
  • High heat conditions
  • High Visibility Site
  • Highly Erodible Site
  • Invasive Species
  • Latin America
  • Limited Access
  • Little Organic Matter
  • Livestock
  • Low Budget
  • Malas Hierbas
  • Manitoba
  • Manta hidraulica
  • minería
  • Mining
  • Minnesota
  • Native Seeds
  • No supplemental watering
  • Northern Climate
  • Ontario
  • pendientes pronunciadas
  • Poca materia orgánica
  • Previous Vegetation Failed
  • Previously failed revegetation
  • Quebec
  • Quick Vegetation Required
  • Reclamation
  • recuperación
  • Remote Site
  • Residential
  • restauración
  • Restoration
  • Sandy Soil
  • semillas nativas
  • Shaded slopes
  • Significant Rain Event
  • Sitio protegido
  • sitio remoto
  • Slopes of 3:1 or greater
  • Steep Slopes
  • suelo arenoso
  • Suelos Pobres
  • Texas
  • Tierras aridas
  • TRMs
  • UK
  • USA
  • vegetación rápida requerida
  • Vegetation required for project close out
  • Washington
  • Waterway
  • Wattles/Stenlogs
  • Wildlife Issue
After Use of Biotic Earth, Full Vegetation Success

Hydro Quebec - James Bay, Quebec, Canada

In 2004, Hydro Quebec worked with Verdyol to combine peat moss with their wheat based straw mulch to help reclaim road sides that were being built on their northern construction sites near James Bay. This project was located in the Northern Boreal forest where salvaging topsoil was impossible, and there was no topsoil to import.

View More
Successful Vegetation Achieved in 3 Months

Grand Parkway Houston, TX

Grand Parkway is a large scale project for the creation of another loop around the Houston, TX metro area. Previous segments of the project had significant issues establishing successful vegetation, resulting in erosion problems for the project. 

View More
Finished Project, Green Grass

Cordova, Alaska

Bohemian Knotweed is an invasive species that can take over an area, choking out existing vegetation and leading to erosion as the better suited species are displaced. Such was the case in Cordova Alaska, situated on the southeastern end of Prince William Sound. Eradicating the knotweed and establishing desired vegetation quickly was necessary to halt the advance of the destructive knotweed and restore the area.

View More

Line 2E Terra Nova Case Study: Terra Nova, ON

With extreme cut inclines (1:1 and steeper), the Line 2E Road project, near Terra Nova, in Southern Ontario, was quite challenging.

View More
ECBVerdyol

Reserves at Chesterfield Village

The Reserves at Chesterfield Village is an upscale residential development bordering Chesterfield Creek.

View More
ECB Verdyol

Business 83

A side slope from a roadway ended at the fence line of a private property on this project; so long-term vegetation to prevent possible erosion was a necessity.

View More
Three Months After Installation, Fully Vegetated

San Antonio River Authority

The San Antonio River Authority needed to vegetate a section of the Mission Reach Project on the San Antonio River. The project site had previously needed to have invasive species removed and was in an area that was prone to erosion due to concentrated flow: quick and dense desirable vegetation establishment was imperative to combatting both issues

View More
ECB Verdyol

Olympic Park

The Canada Olympic Park featured steep slopes that were highly erodible due to the extremely sandy slopes. This caused runoff and sediment accumulation on the COP West Parking Lot. 

View More
After Application, Fully Vegetated

Papillion Road Project, Nebraska

This City park project was a re-channelization of a drainage swale designed by Thompson Dreessen & Dorner, Inc, of Omaha, NE. The channel was needed to mitigate and existing road side ditch that the Corps of Engineers claimed as a jurisdictional waterway.

View More
ECB Verdyol

Milner Ridge

This project for a provincial medium-security jail called for two waste water treatment ponds, with 70,000 m2 (83,719 sy) of slopes and channels to install and protect. The project location had incredibly sandy and erodible soils due to the area being a sand deposit from Lake Agassiz that was created during the last ice age. 

View More

Contact

Riverton Plant
Highway 8 & RD 136N Riverton,
Manitoba R0C 2R0 Canada
Email: csr@ecb.ca
We have stocking locations in both the US and Canada

Office

Toll-Free:
1-866-280-7327

Sitemap

  • Home
  • About Us
  • Products
  • Shop
  • Case Studies
  • Resources
  • Team
  • Installation
  • FAQ
  • Blog
  • Contact
  • Job Opportunities

Products

  • Erosion Control Blankets
  • Turf Reinforcement Mats
  • Sediment Control
  • Biotic Soil Amendments

Connect

  • Facebook
  • Twitter
  • YouTube

Purchase Information

Orders & Sales Inquiries
Email: sales@ecb.ca

Winnipeg Web Design By Verda Design
© 2023 ECBVerdyol. All Rights Reserved.

ECB Newsletter