This project for a provincial medium-security jail called for two waste water treatment ponds, with 70,000 m2 (83,719 sy) of slopes and channels to install and protect. The project location had incredibly sandy and erodible soils due to the area being a sand deposit from Lake Agassiz that was created during the last ice age.