Skip to main content

ECBVerdyol

  • English
  • Spanish

Main navigation

  • Home
  • About Us
  • Products
    • Erosion Control Blankets
    • Turf Reinforcement Mats
    • Sediment Control
    • Biotic Soil Amendments
  • Shop
  • Case Studies
  • Resources
  • Team
  • Installation
  • FAQ
  • Blog
  • Contact
  • Job Opportunities

Case Studies

Breadcrumb

  1. Home
  2. Case Studies
Filter
  • Sitio altamente erosionable
  • Alaska
  • Arid Climate
  • Biotic Earth
  • Biotic Earth
  • Canada
  • Clay Soils
  • Clima árido
  • Endmiendas Bioticas
  • Enmienda Biotica
  • Environmentally Protected Site
  • Erosion Control Blankets
  • Especies invasivas
  • Estados Unidos
  • High heat conditions
  • High Visibility Site
  • Highly Erodible Site
  • Invasive Species
  • Latin America
  • Limited Access
  • Little Organic Matter
  • Livestock
  • Low Budget
  • Malas Hierbas
  • Manitoba
  • Manta hidraulica
  • minería
  • Mining
  • Minnesota
  • Native Seeds
  • No supplemental watering
  • Northern Climate
  • Ontario
  • pendientes pronunciadas
  • Poca materia orgánica
  • Previous Vegetation Failed
  • Previously failed revegetation
  • Quebec
  • Quick Vegetation Required
  • Reclamation
  • recuperación
  • Remote Site
  • Residential
  • restauración
  • Restoration
  • Sandy Soil
  • semillas nativas
  • Shaded slopes
  • Significant Rain Event
  • Sitio protegido
  • sitio remoto
  • Slopes of 3:1 or greater
  • Steep Slopes
  • suelo arenoso
  • Suelos Pobres
  • Texas
  • Tierras aridas
  • TRMs
  • UK
  • USA
  • vegetación rápida requerida
  • Vegetation required for project close out
  • Washington
  • Waterway
  • Wattles/Stenlogs
  • Wildlife Issue
After Use of Biotic Earth, Full Vegetation Success

Hydro Quebec - James Bay, Quebec, Canada

In 2004, Hydro Quebec worked with Verdyol to combine peat moss with their wheat based straw mulch to help reclaim road sides that were being built on their northern construction sites near James Bay. This project was located in the Northern Boreal forest where salvaging topsoil was impossible, and there was no topsoil to import.

View More
Successful Vegetation Achieved in 3 Months

Grand Parkway Houston, TX

Grand Parkway is a large scale project for the creation of another loop around the Houston, TX metro area. Previous segments of the project had significant issues establishing successful vegetation, resulting in erosion problems for the project. 

View More
Finished Project, Green Grass

Baffin Windfarm Kenedy Co. TX

Previous attempts at erosion control and vegetation establishment had failed on tower footings at the Baffin Windfarm south of the city of Sarita in Kenedy County Texas. Hot, dry conditions, low soil fertility, and
additional issue of the wind farm being an active cattle ranch combined to make clear why previous attempts at revegetation had been unsuccessful. Due to entanglement risk, the property owner also dictated no erosion control blankets with netting could be used – all erosion control must be hydraulically applied. A special blend of of seed was required due to grazing activity.
 

View More

Line 2E Terra Nova Case Study: Terra Nova, ON

With extreme cut inclines (1:1 and steeper), the Line 2E Road project, near Terra Nova, in Southern Ontario, was quite challenging.

View More
Finished Project, Fully Vegetated

Nevis, Minnesota Project

A residential house had been built and there was a significant hillside that had been removed to provide space for a driveway. After the excavation of the site, the homeowner had a slope that was composed of very fine sands that needed to be stabilized. The slope was so unstable and steep that traditional methods of placing topsoil were difficult to utilize.

View More
ECB Verdyol

Olympic Park

The Canada Olympic Park featured steep slopes that were highly erodible due to the extremely sandy slopes. This caused runoff and sediment accumulation on the COP West Parking Lot. 

View More
ECB Verdyol

Milner Ridge

This project for a provincial medium-security jail called for two waste water treatment ponds, with 70,000 m2 (83,719 sy) of slopes and channels to install and protect. The project location had incredibly sandy and erodible soils due to the area being a sand deposit from Lake Agassiz that was created during the last ice age. 

View More
ECB Verdyol

Mexico-Puebla Highway, Mexico City

Successful  vegetation was crucial to stabilize an 8,000 square meters steep embankment on the Mexico –Puebla Highway.

View More
After Application, Fully Vegetated

South Wales, United Kingdom

The local community of Glyncoch located in Pontypridd South Wales had a challenge on their hands. With a limited budget approved by the local council and operating with volunteer labor trying to regenerate the local community the goals of building a center that would really help the surrounding neighborhood seemed out of reach.

View More

Contact

Riverton Plant
Highway 8 & RD 136N Riverton,
Manitoba R0C 2R0 Canada
Email: csr@ecb.ca
We have stocking locations in both the US and Canada

Office

Toll-Free:
1-866-280-7327

Sitemap

  • Home
  • About Us
  • Products
  • Shop
  • Case Studies
  • Resources
  • Team
  • Installation
  • FAQ
  • Blog
  • Contact
  • Job Opportunities

Products

  • Erosion Control Blankets
  • Turf Reinforcement Mats
  • Sediment Control
  • Biotic Soil Amendments

Connect

  • Facebook
  • Twitter
  • YouTube

Purchase Information

Orders & Sales Inquiries
Email: sales@ecb.ca

Winnipeg Web Design By Verda Design
© 2023 ECBVerdyol. All Rights Reserved.

ECB Newsletter